Five Percent Became Twelve: The New PE Math Lands on the One System You Never Measured

A decade ago, a buyout worked if the company grew EBITDA about five percent a year.
Cheap debt did some of the work, the multiple did some more, and five percent compounded quietly until somebody rang the bell.
That number is now ten to twelve.
Bain put it plainly in their midyear report in June. Twelve is the new five. Leverage is lower, purchase multiples sit at records, and nobody is underwriting multiple expansion any more. The same deal, chasing the same return, needs more than double the earnings growth it needed when today’s playbooks were written.
Sit with that, because the next number is the one that should worry you.
The trend
Here is where the growth has actually been coming from.
In companies exited in 2025, EBITDA margin improvement accounted for 51% of EBITDA growth. Before 2023 that figure was 21.5%. Top line went the other way, from 78.5% down to 49%. That is Alvarez & Marsal’s value creation survey, published in May, across two hundred investors and portfolio company executives.
Read that against Bain and the problem becomes arithmetic rather than opinion. The requirement roughly doubled, and over the same window the portfolio quietly stopped delivering growth through revenue and started delivering it through cost.
Cost is a finite lever. You take the same cost out once. The renegotiated contract, the consolidated tool stack, the management layer that went in year two, none of it pays again in year four. Whatever is left of the ten to twelve comes off the top line.
Which brings us to the third number. In that same survey, 65% of respondents said they were achieving less than half their targeted value.
Not behind. Under half.
And the funds know it. A&M’s North America report, out the same week, is titled Closing the Diligence to Execution Gap. Its conclusion: the next cycle will be defined less by identifying levers and more by building the operating model and execution capacity to deliver them. Bain’s numbers explain the urgency. Roughly 33,000 unsold companies. Average holds stretched to about seven years. A fourth straight year of record low distributions.
Nobody is short of ideas. Everybody is short of delivery.
What I’m seeing
Eighteen sessions this week, across PE portfolio work, founder coaching, RevOps, renewals and pricing. Every one of those companies is being asked to grow. Aggregated and stripped of anything identifying, here is what is standing in the way. Almost none of it is strategy.
Revenue operations is real work with no owner. In five engagements it is being done by whoever has the least bad availability. A support manager. A finance VP. A founder, personally, after hours. In one case there is no CRM at all, just a shared spreadsheet of conference leads. Nobody in that group has the authority to change the system they maintain.
The CRM is the source of truth in name only. Seven or more rooms. Thousands of contacts parked at a lifecycle stage since a migration nobody finished. Duplicates from marketing imports. Dashboards specified and never built. Everyone knows what the system is supposed to be. Nobody has configured it to be that.
Stage names are frozen at the last migration. In one company, negotiation is where deals sit after the master agreement has been signed. Cheapest thing on this list to fix, and the one nobody schedules.
Pricing is set defensively. Four engagements. Phase based pricing low enough that a buyer can take phase one and walk. A flagship account at roughly two thirds of market. The number keeps getting set to protect the relationship rather than price the outcome. Under pricing does not read as generosity. It reads as a statement about what the work is worth.
One person still closes everything. Every deal of consequence, every demo, no script, no prepared environment. It reports as strength, because the person is excellent at it. It is also a single point of failure, and it makes the forecast one person’s diary.
Meanwhile the plans are due. Growth numbers ahead of an autumn investor meeting. A portfolio wide requirement that every company produce a GTM plan by November. A budget reverse engineered from a sponsor set target rather than built up from pipeline.
The throughline
In Formula One, when a team is told to find two seconds a lap, the first place they look is weight. Strip the car. It works, and it works exactly once. After that, the two seconds live in the pit stop and the driver’s line.
So every serious team puts a stopwatch on the pit crew. They film it. They measure the wheel gun, the jack, the release, to the hundredth. Nobody on that grid would accept a pit crew whose performance was a matter of opinion.
The portfolio has already stripped the car. What is left of the ten to twelve lives in the revenue machine, and in most of the companies I sit in, that machine has never been timed. The stage names do not describe what they hold. The pipeline cannot be read without a phone call. The pricing is a feeling. The forecast is one person’s diary.
That gap is plumbing, made almost entirely of work nobody gets promoted for doing. It is also the only thing standing between a value creation plan and what the plan promised.
So the honest move before November has nothing to do with the plan. Name the lag up front. Telling a sponsor in August that your reporting layer cannot yet say what happened last month is uncomfortable. Telling them in October, when the number has been missed and the data cannot explain why, is far worse. In August it is a diagnosis with a remedy. In October it is an excuse.
The plan is rarely the problem. The machine underneath it usually is.